PREPARE-SE PARA O INVERNO: de 10 % a 50 % de desconto em todas as peças OEM!

A menos que seja proibido pelo fabricante. Não inclui produtos de reposição ou da marca Crowley Marine. Preço conforme marcado.

Os nossos armazéns encerram na quinta-feira, 26, e na sexta-feira, 27 de novembro. Feliz Dia da Thanksgiving dos Estados Unidos!

Contate-Nos
Procure por Mais de 1 Milhão de Peças Originais
Fáceis de usar  diagramas de peças Melhor preço  de garantia Especializado  suporte ao vivo Mais de 50 anos  servindo velejadores Enorme seleção de peças OEM  -  de 1950 a 2026 A maioria das peças em estoque  -  Cumprimento no mesmo dia
Peças em estoque- Realização no mesmo dia

Owner's Manual DF115, DF140 Break-In

Produtos Relacionados:
Owner's Manual DF115, DF140 Break-In
99011-90J11-03A
Suzuki Marine

Owner's Manual

  • Check for proper operation of the Power Trim and Tilt.

  • Make sure the tilt pin is securely installed in the proper position.

  • Check for proper trim angle.

  • Make sure you have the boating safety and emergency equipment on board.

BREAK-IN

Proper operation during this break-in period will help ensure maximum life and performance from your engine. The following guidelines will explain proper break-in procedures.

Failure to follow the break-in procedures described below can result in severe engine damage.
Be sure to follow the engine break-in procedures described below.

Break-in period: 10 hours

Break-in procedure

  1. For the initial 2 hours:
    Allow sufficient idling time (about 5 minutes) for the engine to warm up after cold engine starting.

Running at high speed without sufficient warm-up may cause severe engine damage such as piston seizure.
Always allow sufficient idling time (5 minutes) for the engine to warm-up before running at high speed.

After warming up, run the engine at idling speed or the lowest in-gear speed for about 15 minutes.

During the remaining 1 hour and 45 minutes, if safe boating conditions permit, operate the engine in gear at less than 1/2 (half) throttle (3000 r/min.).

You may throttle up beyond the recommended operating range to plane your boat, then immediately reduce the throttle to the recommended operating range.

  1. For the next 1 hour:

Safe boating conditions permitting, operate the engine in gear at 4000 r/min. or at three quarter throttle. Avoid running the engine at full throttle.

  1. Remaining 7 hours:

Safe boating conditions permitting, operate the engine in gear at desired engine speed.
You may occasionally use full throttle; however do not operate the engine continuously at full throttle for more than 5 minutes at any time.

Running continuously at full throttle for more than 5 minutes at a time during the last 7 hours of break-in operation may cause severe engine damage such as seizure.
During the last 7 hours of break-in operation, do not operate at wide open throttle for more than 5 minutes at a time.

OPERATION

BEFORE ATTEMPTING TO START THE ENGINE

  1. Lower the motor into the water.

  2. Make sure the fuel hose is securely connected to the fuel tank and the motor.

  1. Direct the pilot water hole to the position you intend.

  1. Make sure the motor is in “NEUTRAL”.

Share on social:

Produtos Relacionados