Wiring Harness

| No | Part name | Q’ty | Remarks |
|---|---|---|---|
| 1 | Bolt | 2 | M6 x 20 mm |
| 2 | PTT relay | 1 | |
| 3 | Engine hanger | 1 | |
| 4 | Bolt | 2 | M6 x 20 mm |
| 5 | Bolt | 1 | M6 x 14 mm |
| 6 | Holder | 1 | |
| 7 | Cap | 1 | Green |
| 8 | Cap | 1 | Black |
| 9 | Cap | 1 | Yellow |
| 10 | Fuse | 1 | 20 A |
| 11 | Fuse | 1 | 15 A |
| 12 | Fuse | 1 | 30 A |
| 13 | Bolt | 2 | M6 x 16 mm |
| 14 | Plastic tie | 1 | |
| 15 | Bolt | 2 | M6 x 16 mm |
| 16 | Holder | 1 | |
| 17 | Plastic tie | 1 |

| No | Part name | Q’ty | Remarks |
|---|---|---|---|
| 18 | Bolt | 2 | M8 x 25 mm |
| 19 | Holder | 1 | |
| 20 | Bolt | 1 | M6 x 14 mm |
| 21 | Bracket | 1 | |
| 22 | Wiring harness | 1 | |
| 23 | Plastic tie | 1 | |
| 24 | Holder | 1 | |
| 25 | Bracket | 1 | |
| 26 | Dowel | 2 | |
| 27 | Stud bolt | 1 | |
| 28 | Bracket | 1 | |
| 29 | Bolt | 6 | M6 x 28 mm |
| 30 | Grommet | 6 | |
| 31 | Grommet | 4 | |
| 32 | Collar | 6 | |
| 33 | Bolt | 2 | M8 x 35 mm |
| 34 | Bracket | 1 |

| No | Part name | Q’ty | Remarks |
|---|---|---|---|
| 35 | YDIS coupler bracket screw | 1 | 06 x 20 mm |
| 36 | Main relay | 1 | |
| 37 | Main relay screw | 1 | 06 x 20 mm |
| 38 | Nut | 1 | |
| 39 | Bracket | 1 | |
| 40 | Cap | 2 | |
| 41 | PTT motor lead bolt | 2 | M6 x 10 mm |
Removing the wiring harness
- Disconnect the oil pressure switch connector (a) and thermo sensor coupler (b), and then remove the ground leads (c) and (d).

- Remove the bracket (1).

Remove the caps (e), and then remove the PTT relay leads (f).
Disconnect the PTT relay coupler (g), and then remove the PTT relay (2).

- Disconnect the main relay coupler (h), and then remove the main relay (3).

- Remove the ground lead (k).

- Remove the bracket (4) along with the wiring harness.

Remove the YDIS coupler bracket (5).
Remove the plastic ties (6), (7), and (8), holders (m), and fuse holders (n).

Installing the wiring harness
To install all the wiring harnesses, see “Electrical component and wiring harness routing” (5-1).
Install the fuse holders holders (a), and plastic ties (1), (2), and (3).
Install the YDIS coupler bracket (4) and then tighten the YDIS coupler bracket screw (5) to the specified torque.

YDIS coupler bracket screw (5): 3 N.m (0.3 kgf-m, 2.2 ft-lb)
- Install the bracket (6) along with the wiring harness.

- Install the ground lead (c).

Install the main relay (7), and then tighten the main relay screw (8) to the specified torque.
Connect the main relay coupler (d).

Main relay screw (8): 3 Nm (0.3 kgf-m, 2.2 ft-lb)
Install the PTT relay (9), and then connect the PTT relay coupler (e).
Install the PTT relay leads (f), and then tighten the PTT relay lead nuts (g) to the specified torque.
Install the caps (h).

PTT relay lead nut (g): 4 N-m (0.4 kgf-m, 3.0 ft-lb)
- Install the bracket (10).

- Connect the oil pressure switch connector (k), thermo sensor coupler (m), and ground leads (n) and (P).
