¡PREPÁRATE PARA EL INVIERNO: Descuentos del 10 al 50 % en todas las piezas OEM!

A menos que lo prohíba el fabricante. No incluye productos de recambio ni productos de la marca Crowley Marine. Precio indicado.

Busca en más de 1 millón de partes originales
Fácil de usar  diagramas de piezas Mejor precio  garantizado Soporte experto  en vivo 50+ años  al servicio de los navegantes Gran selección de piezas OEM  -  de 1950 a 2026 La mayoría de las piezas en stock  -  Cumplimiento el mismo día
Piezas están disponibles- Ejecuta el mismo día

Power Unit [Wire Harness] [2017]

Productos relacionados:
Power Unit [Wire Harness] [2017]
LIT-18616-JD-64
Yamaha Marine

Wire harness

No Part name Q’ty Remarks
1 PTT relay 1
2 Bolt 2 M6 x 20 mm
3 PTT motor lead bolt 2 M6 x 10 mm
4 Cap 2
5 Engine hanger 1
6 Bolt 2 M6 x 20 mm
7 Bolt 1 M6 x 14 mm
8 Holder 1
9 Cap 3
10 Fuse 2 20 A, for battery, spare is included
11 Fuse 2 20 A, for engine start switch and PTT switch, spare is included
12 Fuse 2 20 A, for main relay, spare is included
13 Bolt 4 M6 x 20 mm
14 Plastic tie 1
15 Bolt 1 M6 x 14 mm
16 Holder 1

No. Part name Q’ty Remarks
17 Plastic tie 1
18 Bolt 2 M8 x 25 mm
19 Holder 1
20 Bolt 1 M6 x 14 mm
21 Bracket 1
22 Wire harness 1
23 Plastic tie 1
24 Holder 1
25 Bracket 1
26 Dowel pin 2
27 Stud bolt 1 M8
28 Bracket 1
29 Bolt 4 M6 x 28 mm
30 Grommet 4
31 Collar 4
32 Bolt 2 M6 x 14 mm
33 Bolt 2 M8 x 35 mm

No. Part name Q’ty Remarks
34 Nut 1 M8
35 Bracket 1
36 Screw 2 M6 x 20 mm
37 Main relay 1
38 Cover 1
39 Grommet 1
40 Bracket 1

Removing the wire harness

  1. Disconnect the oil pressure switch connector “a” and thermo sensor coupler “b”.

  2. Remove the bracket “1”.

  1. Remove the caps “1”, and then remove the PTT relay leads “2”.

  2. Disconnect the PTT relay coupler “a”, and then remove the PTT relay “3”.

  1. Remove the bracket “1” along with the wire harness from the crankcase.

  1. Remove the main relay “1”, and then dis connect the main relay coupler “a”.

  1. Remove the ground leads “1” and “2”, and then remove the bracket “3”.

  1. Remove the ground leads "1".

  1. Remove the fuse holders “1”, joint connectors “a”, and YDIS coupler “b”.

  1. Remove the bracket “1” along with the wire harness.

  1. Remove the plastic ties “1” and holders “2”.

Installing the wire harness

To install all the wire harnesses, See “Electrical component and wire harness routing” (5-1)

  1. Install the holder “1 ” and plastic tie “2”.

  1. Install the bracket “1” along with the wire harness.

  1. Install the fuse holders “1”, joint connector “a”, and YDIS coupler “b”, and then tighten the YDIS coupler bracket screw “2” to the specified torque.

  2. Install the harness clip “c”.

        YDIS coupler bracket screw “2”: 2.5 N•m (0.25 kgf•m, 1.84 ft•lb)

  1. Install the ground leads “1” and “2”, and then install the bracket “3”.

  1. Install the ground lead "1".

  1. Install the cover "1" to the main relay "2".

  1. Connect the main relay coupler “a”.

  2. Install the main relay “1”, and then tighten the main relay screw “2” to the specified torque.

        Main relay screw "2": 2.5 N•m (0.25 kgf•m, 1.84 ft•lb)

  1. Install the bracket “1” along with the wire harness to the crankcase.

  1. Install the PTT relay “1”, and then connect the PTT relay coupler “a”.

  2. Install the PTT relay leads “2”, and then tighten the PTT relay lead nuts “3” to the specified torque.

  3. Install the caps "4".

        PTT relay lead nut "3": 4 Nm (0.4 kgf•m, 3.0 ft•lb)

  1. Install the bracket “1”.

  2. Connect the oil pressure switch connector “a”, thermo sensor coupler “b”.

Share on social:

Productos relacionados