PREPARATION FOR OVERHAUL
- Clean all dirt, mud, dust and foreign material from the engine before the engine is removed and disassembled.
To ensure that you can perform the work cleanly and efficiently, check that you have the proper tools and cleaning equipment before commencing engine removal and disassembly.
During engine disassembly, as parts are disassembled, clean them and place them in trays in their order of disassembly. This will speed up assembly and help ensure that all parts are correctly reinstalled.
When disassembling the engine, keep mated parts together, e.g., cylinder and pis ton and other parts that have been 'mated' through normal wear. Mated sets should be re-used on reassembly or replaced completely.
REMOVAL
- Remove the electrical system parts.
Refer to "ELECTRICAL COMPONENTS" section in chapter 8.
(1) Ground lead from the cylinder head cover
Battery cable
Power trim and tilt motor leads (PTT model)
Power trim and tilt relay (PTT model)
Oil level sensor lead

- Remove the fuel system parts and hose.
Refer to "FUEL SYSTEM" section in chapter 4.
(1) Cooling water pilot hose
Fuel hose on the strainer
