Junction box

| No. | Part name | Q’ty | Remarks |
|---|---|---|---|
| 1 | Junction box | 1 | |
| 2 | PTT relay | 1 | |
| 3 | Bolt | 5 | M6 x 30 mm |
| 4 | Plastic tie | 5 | |
| 5 | Grommet | 5 | |
| 6 | Collar | 5 | |
| 7 | Plastic tie | 3 | |
| 8 | Bolt | 4 | M6 x 25 mm |
| 9 | Holder | 1 | |
| 10 | Cover | 1 | |
| 11 | Anode | 1 | |
| 12 | Screw | 1 | M4 x 12 mm |
| 13 | Clip | 3 | |
| 14 | Plastic tie | 1 | |
| 15 | Hose | 1 | |
| 16 | Hose | 1 | |
| 17 | Gasket | 1 | Not reusable |

| No. | Part name | Q’ty | Remarks |
|---|---|---|---|
| 18 | Bolt | 2 | M6 x 25 mm |
| 19 | Rectifier Regulator | 1 | |
| 20 | Bolt | 2 | M6 x 35 mm |
| 21 | Protector | 1 | |
| 22 | Bolt | 3 | M6 x 16 mm |
| 23 | Washer | 2 | |
| 24 | Nut | 2 | |
| 25 | Cap | 2 | |
| 26 | Junction box wiring harness extension | 1 |
Removing the Rectifier Regulator
Remove the Rectifier Regulator protector (1)
Disconnect the cooling water hoses (a) and (b).
Disconnect the Rectifier Regulator ground lead (c).
Remove the plastic ties (2), and then remove the Rectifier Regulator leads.
Remove the Rectifier Regulator couplers (d) from the junction box.
Remove the Rectifier Regulator (3).

Remove the cover (4) and gasket (5) from the Rectifier Regulator.
Remove the anode (6) from the cover.

Checking the Rectifier Regulator anode
Removing the junction box
Remove the caps (1), and then disconnect the PTT relay terminals (a).
Disconnect the PTT relay coupler (b).
Remove the PTT relay (2).

Disconnect the junction box wiring harness extension terminal (c) and ground lead terminal (d).
Remove the plastic ties (3).
Remove the holder (e) on the wiring harness from the junction box (4).
Remove the junction box (4).

Installing the junction box
Install the junction box (1).
Install the holder (a) on the wiring harness to the junction box (1).
Fasten the wiring harness using the plastic ties (2).
Install the ground lead terminal (b) and junction box wiring harness extension terminal (c).

Install the PTT relay (3).
Connect the PTT relay coupler (d).
Connect the PTT relay terminals (e), and then tighten the PTT relay terminal nuts (4) to the specified torque.
Install the caps (5).

Installing the Rectifier Regulator
PTT relay terminal nut (4): 4 N-m (0.4 kgf-m, 3.0 ft-lb)
Do not reuse a gasket, always replace it with a new one.
Install the anode (1) to the cover (2), and then tighten the anode screw (3) to the specified torque.
Install the gasket (4) and cover (2) to the Rectifier Regulator, and then tighten the Rectifier Regulator cover bolts (5) to the specified torques in 2 stages.

Anode screw (3): 3 N-m (0.3 kgfm, 2.2 ft-lb)
Rectifier Regulator cover bolt (5):
1st: 6 N-m (0.6 kgf m, 4.4 ft-lb)
2nd: 12 N-m (1.2 kgf-m, 8.9 ft-lb)
Install the Rectifier Regulator (6), and then tighten the Rectifier Regulator bolts (7) to the specified torques in 2 stages.
Install the Rectifier Regulator couplers (a) to the junction box.
Connect the Rectifier Regulator ground lead (b).
Fasten the Rectifier Regulator leads using the plastic tie (8).
Connect the cooling water hoses (c) and (d).
Install the Rectifier Regulator protector (9).

Rectifier Regulator bolt (7):
1st 6 N-m (0.6 kgf m, 4.4 ft-lb)
2nd 12 N-m (1.2 kgf m, 8.9 ft-lb)
To fasten the Rectifier Regulator leads, see “Wiring harness routing” (5-6).
