EXPLODED DIAGRAM

REMOVAL AND INSTALLATION CHART
| Step | Procedure/Part name | Q'ty | Service points |
|---|---|---|---|
| CRANK SHAFT AND PISTON | Follow the left "Step" for removal. Refer to "OIL FILTER THERMOSTAT AND EXHAUST COVER REMOVAL". |
||
| 1 | Bolt | 6 x 35 mm | |
| 2 | Bolt | 8 x 82 mm CAUTION:Carry as the torque indication. Less torque down. |
|
| 3 | Crank case cover | 1 | |
| 4 | Bolt | 8 | |
| 5 | Big end cap | 8 | Keep original combination |
| 6 | Crankshaft | 1 | |
| 7 | Main bearing | 5 | Set, Keep original combination |
| 8 | Oil seal | 1 | Not reusable Fit onto the crank shaft |
| 9 | Oil seal | 1 | Not reusable Fit onto the crank shaft |
| 10 | Piston/Connecting rod assembly | 4 | "Y" mark toward the flywheel side |
| 11 | Big end bearing | 4 | Set, Keep original combination |
| 12 | Dowel pin | 2 | 08 x 12 mm |
| 13 | Cylinder block | 1 | |
| PISTON DISASSEMBLY | NOTE: Disassembly/Assembly should be carried out for each piston. Do not mix components. | ||
| (1) | Piston pin clip | 2 | Not reusable |
| (2) | Piston pin | 1 | |
| (3) | Connecting rod | 1 | "Y" mark, toward the flywheel side |
| (4) | Piston assembly | 1 | |
| (5) | Piston ring, top | 1 | |
| (6) | Piston ring, second | 1 | |
| (7) | Piston ring, oil | 1 | |
| (8) | Piston | 1 | |
| Reverse the removal steps for installation. |
SERVICE POINTS
Piston ring installation
- Install:
- Oil ring (#4, #3)
- 2nd ring (#2)
- Top ring (#1)

: Upper oil ring (#3) should be installed its ring gap is aligned with locating pin on the piston.
Ring gap should be positioned respectively as the illustration.
Piston installation
- Install:
- Piston assembly

Piston slider: YU -33294/90890-06529
● Check that the upper oil ring gap is positioned with its locating pin and then install the piston assembly.
● The piston should be installed with the "UP" mark on the piston crown facing toward the flywheel side.
Oil seal installation
- Install:
- Oil seal (1) and (2)

● Do not install the oil seals after tighten the crank case bolts, or the seal may damaged.
● To prevent the inclined seal installation, install the seals, crank shaft and crank case, finger tighten the bolts then lightly knock the seals.
Cylinder inspection
- Measure:
- Cylinder bore "D"
- Out of specification → Rebore/Replace.

● Measure the bore in parallel.
● Average the cross measurements.
| Standard | |
|---|---|
| Cylinder bore D: | 63.000 ~ 63.015 mm (2.4803 ~ 2.4809 in) |
D = Minimum Dia (D₁ ~ D₆)
T = (Maximum D₁, or D₂) - (Minimum D₅ or D₆)
Piston inspection
- Measure:
- Piston diameter
Out of specification → Replace.
- Piston diameter

| Distance (a) | Piston diameter | |
|---|---|---|
| Standard | 5 mm (0.2 in) |
62.950 ~ 62.965 mm (2.4783 ~ 2.4789 in) |
| Over size 1 2 |
+0.25 mm (0.001 in) +0.50 mm (0.002 in) |
Piston clearance
- Calculate:
- Piston clearance
Out of specification → Replace piston and piston ring and/or cylinder.
- Piston clearance

Piston clearance:
0.035 ~ 0.065 mm
(0.0014 ~ 0.0026 in)
Piston pin inspection
- Measure:
- Piston pin diameter
Out of specification → Replace.
- Piston pin diameter

Piston pin diameter:
15.965 ~ 15.970 mm
(0.6285 ~ 0.6287 in)
Piston ring inspection
- Measure:
- Side clearance
Out of specification → Replace piston and/or ring.
- Side clearance

Side clearance:
Top: 0.04 ~ 0.08 mm (0.002 ~ 0.003 in)
2nd: 0.03 ~ 0.07 mm (0.001 ~ 0.003 in)
Oil: 0.30 ~ 0.50 mm (0.012 ~ 0.020 in)
- Measure:
- End gap
Out of specification → Replace.
- End gap

End gap:
Top: 0.015 ~ 0.30 mm (0.006 ~ 0.012 in)
2nd: 0.30 ~ 0.50 mm (0.012 ~ 0.020 in)
Oil: 0.20 ~ 0.70 mm (0.008 ~ 0.028 in)
Install the piston ring in the cylinder. Push the ring with the piston crown.
Crankshaft inspection
- Measure:
- Run-out
Out of specification → Replace.
- Run-out

Run-out: 0.03 mm (0.0012 in)
Main bearing clearance
- Measure:
- Oil clearance
Out of specification → Replace bearing set.
- Oil clearance



Oil clearance:
0.012 mm ~ 0.044 mm
(0.0005 ~ 0.0017 in)
Measuring steps:
Do not switch the bearings. They should be installed in their original positions, otherwise the correct oil clearance may not be obtained, causing engine damage.
- Clean the bearings, main journals and bearing portions of the crank case and cylinder body.
- Place the cylinder body upside down on a bench.
- Install half the bearings (1) and the crankshaft (2) in the cylinder body (3).
Align the projection (a) of the bearing with the notch in the cylinder body.
- Put a piece of Plastigauge onto the crankshaft journal surface.
Do not put Plastigauge over the oil hole in the main journal of the crankshaft.
- Install half the bearings (1) in the crank case.
● Align the projection (a) of the bearing with the notch (b) in the crank case.
● Do not turn the crankshaft until clearance measurement has been completed.
● Tighten the bolts in sequence and two steps of torque.

Bolt (M8):
1st: 15 Nm (1.5 m•kg, 11.1 ft•lb)
2nd: 30 Nm (3.1 m•kg, 22.1 ft•lb)
Bolt (M6):1st: 6 Nm (0.6 m•kg, 4.4 ft•lb)
2nd: 12 Nm (1.2 m•kg, 8.9 ft•lb)|
- Remove the bolts and crankcase.
- Measure the width of the compressed Plastigauge on each main journal.

Crank case diameter (a):
A: Blue 46.016 ~ 46.024 mm
B: Black 46.008 ~ 46.016 mm
C: Brown 46.000 ~ 46.008 mm
Bearing thickness (b):
A: Blue 1.498 ~ 1.502 mm
B: Black 1.494 ~ 1.498 mm
C: Brown 1.490 ~ 1.494 mm
Bearing size should be matched to crank case size. The crank case size is marked on lower part of block as shown. Then match the color. Black case uses Black bearing.
Big end oil clearance
- Measure:
- Oil clearance
Out of specification → Replace bearing set.
- Oil clearance


Oil clearance:
0.020 ~ 0.052 mm
(0.0008 ~ 0.0020 in)
Measuring steps:
Do not switch the bearings. They should be installed in their original positions, otherwise the correct oil clearance may not be obtained, causing engine damage.
- Clean the bearings and bearing portions of the connecting rod.
- Install the upper half of the bearing in the connecting rod and the lower half in the connecting rod cap.
Align the projection (a) of the bearing with the notch (b) in the cap and connecting rod.
- Put a piece of Plasti gauge onto the crank pin.
- Assemble the connecting rod halves.
● Make sure the "Y" marks on the connecting rod face toward the flywheel side of the crankshaft.
● Do not turn the crankshaft until clearance measurement has been completed.
● Tightened the bolts in sequence and two steps of torque.


Bolt:
1st: 6 Nm (0.6 m•kg, 4.4 ft•lb)
2nd: 17 Nm (1.7 m•kg, 12.5 ft•lb)
- Remove the bolts and connecting rod
- Measure the width of the compressed Plastigauge on each crank pin.

Combination for bearing, connecting rod and crank pin Diameter (a):
A: Blue 36.016 ~ 36.024 mm
B: Black 36.008 - 36.016 mm
C: Brown 36.000 ~ 36.008 mm
Bearing thickness (b):
A: Blue 1.494 ~ 1.498 mm
B: Black 1.490 ~ 1.494 mm
C: Brown 1.486 - 1.490 mm
Bearing size should be matched to crank case size. The crank case size is marked on lower part of block as shown. Then match the color. Black case uses Black bearing.