INTAKE MANIFOLD

1) Install the reed-valve assembly, and the gasket reed-valve plate to the intake manifold.
2) Install the manifold assembly to the crank case, and tighten the bolts in sequence and in two steps of torque.
[A] Tightening sequence
Intake manifold:
1st step: 4 Nm (0.4 m⋅kg, 2.9 ft⋅lb)
2nd step: 8 Nm (0.8 m⋅kg, 5.8 ft⋅lb)
FUEL SYSTEM AND ELECTRICAL SYSTEM
1) Install the fuel system referring to page 4-1.
2) Install the electrical system referring to page 8-1.
INSTALLATION

1) Install two dowel pins in position on the exhaust guide.
2) Align the dowel-pin holes on the gasket with dowel pins, and place the gasket on the exhaust guide.
3) Install the power head onto the exhaust guide, tighten the mounting-bolts to the specified torque.
Mounting Bolts: 21 Nm (2.1 m⋅kg, 15 ft⋅lb)
4) Connect the hoses, cables and wires referring to pages 3-2 ~ 3-7.
5) Bolt-on the apron.
6) Check the fittings installation, cable connections and functions before starting the engine to check operation and to check for leaks, referring to pages 3-2 ~ 3-7.
