CONTENTS
| Item\Model | 60 hp/70 hp | 90 hp | Refer page |
|---|---|---|---|
| 1 Packing list | O | O | 3-1 |
| 2 Electric wiring | O | O | 3-2 |
| 3 Fuel line (gasoline and oil) | O | O | 3-6 |
| 4 Gear oil leve | O | O | 3-7 |
| 5 Operation of controls and moving parts | O | O | 3-7 |
| 6 Air bleeding of the oil injection pump | O | 3-8 | |
| 7 Fuel leakage | O | O | 3-8 |
| 8 Water leakage | O | O | 3-8 |
| 9 Exhaust leakage | O | O | 3-8 |
| 10 Engine and lower unit noise | O | O | 3-8 |
| 11 Idle-speed | O | O | 3-8 |
| 12 Ignition timing | O | O | 3-8 |
| 13 Motor exterior | O | O | 3-8 |
| 14 Instructing the new owner | O | O | 3-8 |
PACKING LIST
On unpacking, check that all accessories to the model are included.
| Packing\Model | 60 hp/70 hp | 90 hp |
|---|---|---|
| Outboard motor | O | O |
| Fuel tank | O | O |
| Remote control box | — | — |
| Service tools | O | O |
| Emergency starter rope | O | O |
| Digital meter | ||
| Tachometer, trim meter, oil level warning meter | O | O |
| Motor mounting parts | O | O |
| Remote control cables | — | — |
| Spare spark plugs | O | O |
| Owner’s manual | O | O |
ELECTRIC WIRING Check
Check that all leads and connectors are properly connected.
60 hp/70 hp
[A] To oil level sensor
[B] To electrothermal valve
[C] To power trim and tilt motor
[D] To power trim and tilt switch
[E] To trim sensor
[F] To starter motor
[G] To battery
[H] To wire harness
[I] bracket earth
[K] To digital meter
B: Black
Br: Brown
G: Green
Gy: Gray
L: Blue
Lg: Light green
O: Orange
P: Pink
R: Red
Sb: Sky blue
W: White
Y: Yellow

60 hp

(1) Ground lead from rectifier regulator
(2) Ground lead from wire harness
(3) Ground lead from starter relay
[A] To oil level sensor
[B] To electrothermal valve
[C] To power trim and tilt motor
[D] To power trim and tilt switch
[E] To trim sensor
[F] To starter motor
[G] To battery
[H] To wire harness
[I] To bracket earth
[J] To digital met
B: Black
Br: Brown
G: Green
Gy: Gray
L: Blue
Lg: Light green
O: Orange
R: Red
Sb: Sky blue
W: White
Y: Yellow

90 hp
[A] To oil level sensor
[B] To power trim and tilt motor
[C] To electrothermal valve
[D] To power trim and tilt switch
[E] To starter motor
[F] To trim sensor
[G] To digital meter
[H] To wire harness
B: Black
Br: Brown
G: Green
Gy: Gray
L: Blue
Lg: Light green
O: Orange
R: Red
Sb: Sky blue
W: White
Y: Yellow

[A] To oil level sensor
[B] To power trim and tilt motor
[C] To electrothermal valve
[D] To power trim and tilt switch
[E] To starter motor
[F] To trim sensor
[G] To digital meter
[H] To wire harness
(1) Ground lead from wire harness
(2) Ground lead from starter relay
(3) Ground lead from C.D.I. unit
(4) Ground lead from power trim and tilt relay
(5) Ground lead from rectifier regulator
(6) Clamp
B: Black
Br: Brown
G: Green
Gy: Gray
L: Blue
Lg: Light green
O: Orange
R: Red
Sb: Sky blue
W: White
Y: Yellow

FUEL LINE
Check that the fuel line is correctly installed.
60 hp/70 hp

(1) Oil tank
(2) Oil injection pump
(3) Carburetor
(4) Fuel filter
(5) Fuel pump
90 hp

(1) Oil tank
(2) Oil injection pump
(3) Carburetor
(4) Fuel filter
(5) Fuel pump
GEAR OIL LEVEL

Remove the oil-drain and oil-level plugs, and add the gear oil through the oil-drain hole until it overflows from the oil-level hole. Re-fit the plugs. (The oil level plug first).
OPERATION OF CONTROLS AND MOVING PARTS
Check for correct operation of the shift control.
Check for correct operation of the tilt-lock mechanism.
Check for smooth operation of the steering control.
Check for smooth operation of the throttle control.
Check for correct operation of the spark advancer.
Check for correct operation of the Power trim and tilt unit.
Check for correct operation of the choke system.
Noting the following WARNING and CAUTION, check for correct operation of the starting system.
Before attempting to check the starter system, replace the propeller with the specified test propeller, and make the tests with the motor placed in a test tank.
Use a 50 : 1 gasoline-oil mixture to start the engine.
- Check for correct operation of the engine stop system.
AIR-BLEEDING OF THE OIL INJECTION

PUMP (90 hp)
1) Pour the specified oil into the oil tank, and loosen the air-bleeding screw attached to oil injection pump.
2) After confirming that oil starts overflowing through the screw-hole, tighten the screw
completely.
3) Noting the following CAUTION, start the engine and keep it running at idle-speed.

Use a 50 : 1 gasoline-oil mixture to start the engine.
4) Check that oil flows through the oil feed pipes
