¡PREPÁRATE PARA EL INVIERNO: Descuentos del 10 al 50 % en todas las piezas OEM!

A menos que lo prohíba el fabricante. No incluye productos de recambio ni productos de la marca Crowley Marine. Precio indicado.

Busca en más de 1 millón de partes originales
Fácil de usar  diagramas de piezas Mejor precio  garantizado Soporte experto  en vivo 50+ años  al servicio de los navegantes Gran selección de piezas OEM  -  de 1950 a 2026 La mayoría de las piezas en stock  -  Cumplimiento el mismo día
Piezas están disponibles- Ejecuta el mismo día

Owner's Manual DF115, DF140AZ, DF140A Break-In

Productos relacionados:
Owner's Manual DF115, DF140AZ, DF140A Break-In
99011-90J50-03B
Suzuki Marine

Owner's Manual

  • Check for proper operation of the Power Trim and Tilt.

  • Make sure the tilt pin is securely installed in the proper position.

  • Check for proper trim angle.

  • Make sure you have the boating safety and emergency equipment on board.

BREAK-IN

Proper operation during this break-in period will help ensure maximum life and performance from your engine. The following guidelines will explain proper break-in procedures.

Failure to follow the break-in procedures described below can result in severe engine damage.
Be sure to follow the engine break-in procedures described below.

Break-in period: 10 hours

Break-in procedure

  1. For the initial 2 hours:

Allow sufficient idling time (about 5 minutes) for the engine to warm up after cold engine starting.

Running at high speed without sufficient warm-up may cause severe engine damage such as piston seizure.
Always allow sufficient idling time (5 minutes) for the engine to warm-up before running at high speed.

After warming up, run the engine at idling speed or the lowest in-gear speed for about 15 minutes.

During the remaining 1 hour and 45 minutes, if safe boating conditions permit, operate the engine in gear at less than 1/2 (half) throttle (3000 r/min.).

You may throttle up beyond the recommended operating range to plane your boat, then immediately reduce the throttle to the recommended operating range.

  1. For the next 1 hour:

Safe boating conditions permitting, operate the engine in gear at 4000 r/min. or at three quarter throttle. Avoid running the engine at full throttle.

  1. Remaining 7 hours:

Safe boating conditions permitting, operate the engine in gear at desired engine speed.
You may occasionally use full throttle; however do not operate the engine continuously at full throttle for more than 5 minutes at any time.

Running continuously at full throttle for more than 5 minutes at a time during the last 7 hours of break-in operation may cause severe engine damage such as seizure.
During the last 7 hours of break-in operation, do not operate at wide open throttle for more than 5 minutes at a time.

OPERATION

BEFORE ATTEMPTING TO START THE ENGINE

  1. Lower the motor into the water.

  2. If there is a manual fuel tank air-vent, turn the air-vent screw (1) on top of the fuel tank cap fully counterclockwise to open the vent.

When connecting the fuel hose to the portable fuel tank or motor, the fuel may be under pressure and may spray out around the connector, causing serious injury.
Before connecting the fuel hose, loosen and retighten the fuel tank cap once to relieve the fuel pressure in fuel tank.
For handling the fuel tank cap, refer to the “FUEL AND OIL/FILLING FUEL TANK” section in this manual.

SUZUKI genuine portable fuel tanks have a semi-auto air vent.

Share on social:

Productos relacionados