PREDELIVERY SERVICE
| Item\Model | CV85E | Refer page |
|---|---|---|
| 1 Contents | O | 3.1 |
| 2 Electric wiring | O | 3.2 |
| 3 Fuel line | O | 3.4 |
| 4 Gear oil level | O | 3.5 |
| 5 Operation of controls and moving parts | O | 3.5 |
| 6 Fuel leakage | O | 3.6 |
| 7 Water leakage | O | 3.6 |
| 8 Exhaust leakage | O | 3.6 |
| 9 Engine and lower unit noise | O | 3.6 |
| 10 Idle-speed | O | 3.6 |
| 11 Ignition timing | O | 3.6 |
| 12 Motor exterior | O | 3.6 |
| 13 Instructing the new owner | O | 3.6 |
CONTENTS
On unpacking, check that all accessories to the model are included.
| Contents\Model | CV85E |
|---|---|
| Outboad motor | O |
| Fuel tank | O |
| Remoto control box | O |
| Service tools | O |
| Emergency starter rope | O |
| Motor mounting parts | O |
| Spare spark plugs | O |
| Owner’s manual | O |
ELECTRIC WIRING
Check that all leads and connectors are properly connected.


(1) Battery cable (Negative)
(2) Ground lead from wire harness
(3) Starter motor lead (Negative)
(4) Ground lead from cylinder head
B : Black
Br : Brown
G : Green
Gy : Gray
L : Blue
Lg : Light-green
O : Orange
p : Pink
R : Red
Sb : Sky-blue
W : White
Y : Yellow
FUEL LINE
Check that the fuel line is correctly installed.

(1) Carburetor
(2) Fuel filter
(3) Fuel pump
GEAR OIL LEVEL

Remove the oil-drain and oil-level plugs, and add the gear oil through the oil-drain hole until it overflows from the oil-level hole. Re-fit the plugs. (The oil level plug first).
OPERATION OF CONTROLS AND MOVING PARTS
Check for correct operation of the shift control.
Check for correct operation of the tilt-lock mechanism.
Check for smooth operation of the steering control.
Check for smooth operation of the throttle control.
Check for correct operation of the spark advancer.
Check for correct operation of the choke system.
Noting the following WARNING and CAUTION, check for correct operation of the starting system.
Before attempting to check the starter system, replace the propeller with the specified test propeller, and make the tests with the motor placed in a test tank.
Use a 25:1 gasoline mixture to start the engine.
- Check for correct operation of the engine stop system.
FUEL LEAKAGE
Check for fuel leakage.
