PREDELIVERY SERVICE
| Item\Model | 70ETG | 90ETG | Refer page |
|---|---|---|---|
| 1 Contents | O | O | 3-1 |
| 2 Electric wiring | O | O | 3-2 |
| 3 Fuel line (gasoline and oil) | O | O | 3-6 |
| 4 Gear oil level | O | O | 3-7 |
| 5 Operation of controls and moving parts | O | O | 3-7 |
| 6 Air bleeding of the oil injection pump (gasoline and oil) | O | O | 3-8 |
| 7 Fuel leakage | O | O | 3-8 |
| 8 Water leakage | O | O | 3-8 |
| 9 Exhaust leakage | O | O | 3-8 |
| 10 Engine and lower unit noise | O | O | 3-8 |
| 11 Idle-speed | O | O | 3-8 |
| 12 Ignition timing | O | O | 3-8 |
| 13 Motor exterior | O | O | 3-8 |
CONTENTS
On unpacking, check that all accessories to the model are included.
| Contents\Model | 70ETG | 90ETG |
|---|---|---|
| Outboad motor | O | O |
| Fuel tank | O | O |
| Remoto control box | O | O |
| Service tools | O | O |
| Emergency starter rope | O | O |
| Digital meter | ||
| Tachometer, trim meter, oil level warning meter | O | O |
| Moter mounting parts | O | O |
| Remote control cables | O | O |
| Spare spark plugs | O | O |
| Owner’s manual | O | O |
ELECTRIC WIRING
70ETG

B : Black
Br : Brown
G : Green
Gy : Gray
L : Blue
Lg : Light green
O : Orange
P : Pink
R : Red
Sb : Sky blue
W : White
Y : Yellow

90ETG

B : BLACK
Br : Brown
G : Green
Gy : Gray
L : Blue
Lg : Light green
O : Orange
P : Pink
R : Red
Sb : Sky blue
W : White
Y : Yellow

(1) Ground lead from cylinder head
(2) Starter motor lead (Negative)
(3) Ground lead from wire harness
(4) Battery cable (Negative)
(5) Power trim and tilt motor ground lead
(6) Ground lead of power trim and tilt relays
(7) Ground lead of wire harness
FUEL LINE
70ETG

(1) Oil tank
(2) Oil injection pump
(3) Carburetor
(4) Fuel filter
(5) Fuel pump
90ETG

(1) Oil tank
(2) Oil injection pump
(3) Carburetor
(4) Fuel filter
(5) Fuel pump
GEAR OIL LEVEL

Remove the oil-drain and oil-level plugs, and add the gear oil through the oil-drain hole until it overflows from the oil-level hole. Re-fit the plugs. (The oil level plug first).
OPERATION OF CONTROLS AND MOVING PARTS
Check for correct operation of the shift control.
Check for correct operation of the tilt-lock mechanism.
Check for smooth operation of the steering control.
Check for smooth operation of the throttle control.
Check for correct operation of the spark advancer.
Check for correct operation of the Power trim and tilt unit.
Check for correct operation of the choke system.
Noting the following WARNING and CAUTION, check for correct operation of the starting system.
Before attempting to check the starter system, replace the propeller with the specified test propeller, and make the tests with the motor placed in a test tank.
Use a 50 : 1 gasoline-oil mixture to start the engine.
- . Check for correct operation of the engine stop system.
AIR-BLEEDING OF THE OIL INJECTION PUMP

1) Pour the specified oil into the oil tank, and loosen the air-bleeding screw attached to oil injection pump.
2) After confirming that oil starts overflowing through the screw-hole, tighten the screw completely.
3) Noting the following CAUTION, start the engine and keep it running at idle-speed.

Use a 50 : 1 gasoline-oil mixture to start the engine.
4) Check that oil flows through the oil feed pipes.
FUEL LEAKAGE
WATER LEAKAGE
EXHAUST LEAKAGE
ENGINE AND LOWER UNIT NOISE
IDLE-SPEED
IGNITION TIMING
MOTOR EXTERIOR
INSTRUCTING THE NEW OWNER
Instruct the new owner on the operation of all controls and the break-in procedure. Also advise him on propeller-to-boat matching.
