Step 1: Vapor separator and APS

| No. | Part name | Q’ty | Remarks |
|---|---|---|---|
| 1 | Bolt | 4 | |
| 2 | Collar | 8 | |
| 3 | Grommet | 4 | |
| 4 | Vapor separator | 1 | |
| 5 | Drain hose | 1 | |
| 6 | Hose | 1 | Joint to canister |
| 7 | Hose | 1 | Pressure regulator to intake manifold |
| 8 | Holder | 1 | |
| 9 | Holder | 1 | |
| 10 | Hose | 1 | Vapor separator to fuel rail |
| 11 | Holder | 1 | |
| 12 | Hose | 3 | Low-pressure fuel pump to vapor separator |
| 13 | Plastic tie | 1 | |
| 14 | Hose | 1 | Canister to joint |
| 15 | Joint | 1 | |
| 16 | Hose | 1 | Check valve to joint |
| 17 | Hose | 1 | Joint to check valve, F200 |

| No. | Part name | Q’ty | Remarks |
|---|---|---|---|
| 18 | Check valve | 4 | |
| 19 | Hose | 8 | Check valve to bottom cowling, F200 |
| 20 | Clamp | 4 | |
| 21 | Clamp | 1 | |
| 22 | Wire harness | 1 | |
| 23 | APS | 1 | |
| 24 | Bolt | 1 | M6 x 35 mm |
| 25 | Hose | 1 | Vapor separator to joint |
| 26 | Joint | 1 | |
| 27 | Holder | 1 | |
| 28 | Bolt | 1 | M6 x 10 mm |
| 29 | Hose | 3 | Vapor separator to joint |
| 30 | Hose | 1 | Vapor separator to joint |
| 31 | Joint | 1 | |
| 32 | Clamp | 1 |
Step 2: Removing the vapor separator
Cover the fuel components using a rag to prevent fuel from spilling out.
Drain the fuel. See “Draining the fuel” (6-10).
Remove the clamps “1”, “2”, and “3”.
Remove the cooling water hoses “4” and “5” from the vapor separator assembly.
Disconnect the high-pressure fuel pump coupler “a”.

- Remove the vapor separator assembly “1”.

- Remove the clamp “1”, and then remove the vapor gas hoses “2” from the bottom cowling.

- Disassemble the vapor gas hoses “1”, “2”, “3”, and “4”, joint “5”, and check valves “6”.

- Remove the pressure regulator hose “1”, vapor gas hoses “2”, “3”, and “4”, joint "5".

Remove the fuel hose “1” and quick connector “2”. See steps 2 and 3 in “Disconnecting the quick connector” (6-1).
Remove the drain hose “3”.
Disconnect the fuel pump coupler “a”.

- Remove the fuel hose “1”

Step 3: Removing the APS
Disconnect the APS coupler “a”.
Remove the APS “1”.

Step 4: Checking the canister check valve
Connect the special service tool “1” to the canister check valve port.
Apply positive pressure and check that air comes out of the opposite end of the canister check valve. Replace the canister check valve if no air comes out.

Vacuum/pressure pump gauge set "1" 90890-06945
Pressure/vacuum tester "1" YB-35956-B
- Connect the special service tool “1” to the opposite canister check valve port.
- Apply positive pressure and check that no air comes out of the opposite end of the canister check valve. Replace the canister check valve if air comes out.

Step 5: Checking the APS
Check the APS exterior. Replace if cracked.
Check the electrical performance of the APS. See “Checking the APS” (5-21)
Step 6: Installing the APS
Install the APS “1”.
Connect the APS coupler “a”

Step 7: Installing the vapor separator
- Connect the vapor gas hoses “1 ”, “2”, “3”, and “4” to the joint “5” and check valves “6”.

- Install the vapor gas hose “1” to the bottom cowling, and then fasten it using the clamp “2”.

Connect the fuel hose “1” to the vapor separator assembly, and then fasten it using the plastic tie “2”.
Install the holder “3”.

Connect the fuel pump coupler “a”.
Install the drain hose “1”.
Connect the quick connector “2”.
Install the fuel hose “3”, and then fasten it using the clamp “4”.
Fasten the fuel hose “3” and “5” using the holder “6”

Connect the pressure regulator hose “1”, vapor gas hoses “2”, “3”, and “4”, and joint “5”.
Fasten the pressure regulator hose “1” and vapor gas hose “2” using the holder “6”.
Fasten the vapor gas hose “4” and fuel hose using the holder “7”.

- Install the vapor separator assembly “1”.

Connect the high-pressure fuel pump coupler “a”.
Fasten the fuel hose “1” and high-pressure fuel pump lead “2” using the clamp “3”.
Fasten the high-pressure fuel pump lead “2” and vapor gas hoses “4” using the clamp “5”.
Connect the cooling water hose “6” to the vapor separator, and then fasten it using the plastic tie “7”.
Connect the cooling water hose “8” to the vapor separator.
Fasten the knock sensor lead “9”, pressure regulator hose “10”, and vapor gas hose “11” using the clamp “12”.

