PTT switch and cowling lock lever

| No | Part name | Q’ty | Remarks |
|---|---|---|---|
| 1 | Gasket | 2 | |
| 2 | PTT switch | 1 | |
| 3 | Bolt | 4 | M6 x 12 mm |
| 4 | Holder | 2 | |
| 5 | Cover | 1 | |
| 6 | Cowling lock lever (STBD) | 1 | |
| 7 | Cowling lock lever (PORT) | 1 | |
| 8 | Cowling lock lever (front) | 1 | |
| 9 | Bushing | 6 | |
| 10 | Washer | 3 | |
| 11 | Wave washer | 3 | |
| 12 | Lever | 3 | |
| 13 | Bolt | 3 | M8 x 12 mm |
| 14 | Spring | 3 | |
| 15 | Bolt | 3 | M6 x 12 mm |
| 16 | Hook | 3 | |
| 17 | Guide | 1 |

| No | Part name | Q’ty | Remarks |
|---|---|---|---|
| 18 | Grommet | 1 | |
| 19 | Hose | 1 | Hose joint to exhaust cover |
| 20 | Plastic | 3 | |
| 21 | Hose joint | 1 | |
| 22 | Hose joint | 1 | |
| 23 | Gasket | 1 | |
| 24 | Adapter | 1 | |
| 25 | Screw | 2 | M6 x 19 mm |
Removing the PTT switch
- Remove the holder “1”, and then remove the PTT switch “2”.

Removing the cowling lock lever
Remove the spring “1”, and then remove the hook “2”.
Remove the lever “3”, wave washer “4”, washer “5”, bushing “6", cowling lock lever “7”, and bushing “8”.

Removing the flushing hose
- Remove the adapter “1” and hose joints “2”, and “3”.

- Disconnect the guide “1” from the grommet “2”.

- Remove the flushing hose “1”, PTT motor leads “2”, trim sensor lead “3”, and grommet “4”.

Installing the flushing hose
Install the grommet “1” to the bottom cowling.
Pass the flushing hose “2”, trim sensor lead “3”, and PTT motor leads “4” through the grommet “1”, and then fasten them using the plastic ties “5” around the grommet “1”.
Align the red tape “a” on the PTT motor leads “4” with the outer end of the grommet “1”.

- Install the guide "1" to the grommet "2".

Install the flushing hose adapter “1”, and then tighten the flushing hose adapter screws “2” to the specified torque.
Route the flushing hose “5” through the hose joint “3”, install it to the hose joint “4”, and then fasten the flushing hose “5” using the plastic tie “6”.
Install the hose joint to the adapter “1” along with the gasket “7”.

Flushing hose adapter screw "2" 4 N-m (0.4 kgf-m, 3.0 ft-lb)
Installing the cowling lock lever
Install the bushing “1”, cowling lock lever “2”, bushing “3”, washer “4”, wave washer “5”, and lever “6”.
Install the hook “7’, and then install the spring “8”.

Installing the PTT switch
- Install the gasket “1”, PTT switch “2”, and holder “3”.