EXPLODED DIAGRAM

REMOVAL AND INSTALLATION CHART
| Step | Procedure/Part name | Q'ty | Service points |
|---|---|---|---|
| PTT MOTOR DISASSEMBLY | Follow the left "Step" for removal. | ||
| PTT motor | |||
| 1 | Screw | 2 | |
| 2 | Stator | 1 | |
| 3 | O-ring | 1 | 49.5 x 2.0 mm |
| 4 | Screw | 2 | |
| 5 | Brush holder | 1 | |
| 6 | Brush | 2 | |
| 7 | Brush spring | 2 | |
| 8 | Screw | 1 | |
| 9 | Armature | 1 | |
| 10 | PTT motor base | 1 | |
| Reverse the disassembly steps for installation |
SERVICE POINTS

Motor inspection
- Inspect:
- Commutator
Dirt —> Clean with 600 grit sandpaper.
- Inspect:
- Segment undercut
Obstruction -> Clean.
NOTE:
Remove all metal particles with compressed air.

- Measure:
- Commutator diameter(a)
Out of specification -> Replace.
Commutator diameter limit: 15.5mm (0.61 in)

- Measure:
- Armature coil continuity
Out of specification -> Replace.
Armature coil continuity
| Commutator segments | Continuity |
|---|---|
| Segment - laminations | No continuity |
| Segment - shaft | No continuity |

- Measure:
- Brush lenght (a)
Out of specification-> Replace.
Brush lenght limit:
3mm (0.12 in)

- Inspect:
- PTT Motor Base
Cracks/damage-> Replace.
- Inspect:
- Stator Bushing
- PTT Motor Base bushing
Cracks/damage-> Replace.
- Inspect:
PTT Motor Base oil seal
Damage/wear -> Replace.PTT motor assembly
- Check:
PTT motor operation
Incorrect operation -> Repair.
PTT motor operation
| Blue (+), Green (-) | Motor turns clockwise |
|---|---|
| Green (+), Blue (-) | Motor turns counterclockwise |
