PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Setup Manual DF200AP Multi Function Gauge System Connection

Setup Manual DF200AP Multi Function Gauge System Connection
Suzuki Marine

MULTI FUNCTION GAUGE SYSTEM CONNECTION

Select the connection method from the examples in the following pages and arrange the required wiring.

For setting up the multi-function gauge, refer to “INSTALLATION INSTRUCTION MANUAL” packed in the gauge.

T- Connector

T-Connectors must be connected to be a straight line of “T”s as shown in the illustration.

• Secure the T-connectors to a solid surface or to an existing wire harness, do not leave them free-floating.
• Do not overstress cables or connectors by using excessive force when tightening or pulling.

SINGLE ENGINE – SINGLE STATION

SINGLE ENGINE – DUAL STATIONS

DUAL ENGINES – SINGLE STATION

DUAL ENGINES – DUAL STATIONS

TRIPLE ENGINES – SINGLE STATION

TRIPLE ENGINES – DUAL STATIONS

QUADRUPLE ENGINES – SINGLE STATION

QUADRUPLE ENGINES – DUAL STATION

Share on social: