Starter Installation
Install the ground cable to the starter housing. Tighten the screw to a torque of 60 to 84 in. lbs. (7 to 10 N·m).
Apply Locquic Primer and Nut Lock to the threads of the four starter mounting screws. Position the starter and install the screws and lock washers.
First, tighten the top two screws, then the bottom two screws. Tighten screws to a torque of 15 to 17 ft. lbs. (20 to 23 N·m).
Attach the positive (+) cable to the “B” terminal on the solenoid with lock washer and nut; tighten securely.
Attach the red/tan wire to the “S” terminal on the solenoid with lock washer and nut; tighten securely.

- Upper mounting screws
- Lower mounting screws
- “B” terminal
- “S” terminal
Coat the terminal connections with No-Ox Grease, P/N 768230.
Connector Servicing
DEUTSCH Connectors
IMPORTANT: Dielectric Grease, P/N 503243 is recommended. Incorrect grease application can cause electrical or warning system problems. To disconnect the connector, press the latch and pull the connectors apart.
To disconnect the connector, press the latch and pull the connectors apart.
To connect the connector, confirm that the seal is in place. Clean off any old grease and dirt from connectors. Apply a light coat of Dielectric Grease, P/N 503243, to the seal only. Push connectors together until latched.

- Latch
- Seal
Terminal Removal
Use hook-end of Connector Service Tool, P/N 342667, to pull out the lock-wedge from the receptacle. Use other end of the tool to pry out the lock-wedge from the plug. Use needle-nose pliers to the remove lock-wedge from 3-pin receptacle.

- Wedge
Release terminal latch and gently pull on wire.

- Terminal latch (receptacle)
- Terminal latch (plug)
Terminal Installation
Push terminal through seal until it locks into place. Fill the lock-wedge cavity to the end of the plug (approximately 1/32 inch {0.8 mm}), with Dielectric Grease, P/N 503243.

- Lock-wedge cavity
- End of plug
Push the lock-wedge in until latched. The wedge in 2-pin receptacle is not symmetrical; position latch shoulders next to terminals.
Crimping Terminals
Strip insulation back 3/16 in. (5 mm). Place terminal in 18-gauge notch of Crimping Pliers, P/N 322696. Position end of wire strands in terminal past wire crimp area, and position end of insulation past insulation crimp area. Capture all wire strands in crimp; leave no loose strands. Crimp wire securely. Do not solder. Crimp insulation in 14/16-gauge notch of crimping pliers.

- End of wire strands
- Insulation crimp area
- End of insulation
- Wire crimp area
AMP Connectors
IMPORTANT: Always use the appropriate meter test probes and adapters when testing components fitted with these terminals. Dielectric Grease is NOT used on AMP connectors.
SUPERSEAL 1.5
Disconnect
Lift latch. Pull connectors apart.
Connect
Confirm the seal is in place. Push connectors together until latched.
- Latch
- Seal
Terminal Removal
Use Secondary Lock Tool, P/N 777078, to release the locking device of the connector housing. Next, use Primary Lock Tool, P/N 777077, to release locking tab of connector housing. Release locking tab and pull on wire to remove from connector housing.

- Locking device, plug
- Locking device, receptacle

- Locking tab, plug
- Locking tab, receptacle
Terminal Installation
Align terminal with connector housing. Push connector and seal into housing until seated.

- Terminal and seal
Align locking device with connector housing and terminals. Use Secondary Lock Installer, P/N 777079, to seat device in connector.
Crimping Terminals
Crimping Superseal 1.5 terminals requires AMP Crimp Tool with dies, P/N 777281

- Terminal
- Seal
SUPER SEAL
The J1-A, J1-B and J3 connectors of the EMM are AMP Super Seal connectors.
Disconnect
Depress BOTH latches and pull connector from plug.
Connect
Push connector into plug until latches engage.

J1A and J1B Connectors
- Latch
Terminal Removal
Open lock mechanism and remove terminal from connector housing.

- Latch
- Lock mechanism
Terminal Installation
Push terminal through seal until it is seated in connector housing. Close lock mechanism.

- Terminal
POWER TIMER SERIES
The J2 and J4 connectors of the EMM are AMP Power Timer Series connectors.
Disconnect
Use a screw driver to open latch. Pull connector from plug.
Connect
Push connector until seated in plug. Close latch completely.

- J2 connector
- Latch (closed)
Terminal Removal
Use Terminal Release Tool, P/N 351413, to release BOTH locking mechanisms of connector. Pull terminal from housing.

- Locking mechanism(s)

- Terminal release tool
Terminal Installation
Align terminal with connector housing and push terminal with seal into connector housing until seated.

- Latch
- Terminal with seal
Packard Connectors
IMPORTANT: Always use the appropriate meter test probes and adapters when testing components fitted with these terminals.
Disconnect
Lift latch(es). Remove connector.
Connect
Confirm the seal is in place. Push connector onto housing until latched.

Terminal Removal
A tab on the back side of the terminal engages a shoulder in the connector housing to hold the terminal in place. The terminal is removed by releasing the tab and then pushing the terminal and wire through connector housing.
Insert a thin tool into the connector above the terminal to release tab.

- Tab
Terminal Installation
Install wire gasket on wires and feed wires through the correct terminal position of the connector housing. Terminal is crimped onto wire and then pulled back into connector housing until locking tab engages and terminal is seated.

Crimping Terminals
Strip insulation back 3/16 in. (5 mm). Position end of wire strands in terminal past the wire crimp area and the end of insulation in the insulation crimp area of the terminal.
Capture all wire strands in crimp; leave no loose strands. Crimp wire and insulation securely using crimping pliers.
