PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Service Manual Evinrude E-TEC 40-60 HP Cooling System [Pressure Relief Valve Servicing]

Related Products:
Service Manual Evinrude E-TEC 40-60 HP Cooling System [Pressure Relief Valve Servicing]
5007209
BRP Marine

Service Manual Evinrude E-TEC 40-60 HP Cooling System [Pressure Relief Valve Servicing]

der head with side marked “TO CYL HEAD” facing thermostat.

  1. Cylinder head seal

Inspection

Inspect all components for cracks, heat damage, or signs of corrosion. Replace damaged components. Clean debris from all housings and thermostat components.

Assembly

Assembly is essentially the reverse of disassembly. Pay close attention when performing the following additional tasks.

Coat threads of cylinder head thermostat cover with Gasket Sealing Compound and install new O-ring. Install and tighten the cover to a torque of 120 to 144 in. lbs. (13.5 to 16 N·m).

PRESSURE RELIEF VALVE SERVICING

The pressure relief valve assembly should be serviced at the same time as the thermostat.

Disassembly

Remove pressure relief valve cover retaining screws.

Remove the pressure relief valve assembly.

Inspection

Inspect all components for cracks, heat damage, or signs of corrosion. Replace damaged components. Clean all debris from pressure relief valve components.

Pressure Relief Valve Assembly Component

Assembly

Assembly is essentially the reverse of disassembly. Assemble components as shown above.
Torque cover screws to 60 to 84 in. lbs. (7 to 9.5 N·m).

Share on social:

Related Products