REMOVAL

Tilt engine fully up and lower the manual tilt lock levers (1).
During the following procedures, firmly secure the engine and support its weight. (see right)

Remove the tilt rod snap ring (2) and push tilt cylinder upper shaft pin (3) out.

Lower tilt rod to full down position and disconnect the battery cable.

Disconnect the PTT motor cable wire leads (G, Bl) from the PTT relays.
Remove the PTT motor cable from engine lower cover.

Remove the two STBD motor mounting bolts (4).
Loosen the clamp bracket shaft nut (5).
Complete removal of the clamp bracket shaft nut is not required. Nut should be loosened as far as the end of the shaft threads only to facilitate removal of the PTT unit.

Remove the both lower shaft bolts (6).

Slide the STBD clamp bracket fully outward to the right hand side.
Remove the PTT unit from between the clamp brackets.

Check all bush.
If excessive wear or other damage is found, replace bush.
If bush fit is loose when installing, replace bush.
DISASSEMBLY

Before disassembly, wash the PTT body with a stiff bristle brush and hot, soapy water to remove sand or dirt and dry the PTT body with compressed air.
Connect the PTT motor cable leads (G, Bl) to battery and operate PTT motor until tilt piston rod is at maximum stroke. (full-tilt up position)
Place the lower mounting eye of the PTT cylinder in a vise. Tighten the vise only enough to secure the PTT unit, do not over tighten.
To prevent damage to the PTT cylinder use wood blocks, vise jaw protectors, etc., between the vise jaws and PTT component before tightening vise.

Remove the PTT motor.
Note the position of drive joint (3) and O-ring (4), before removing them. (See page 13-63)
Unscrew the fill plug and drain PTT oil into suitable container.

Remove the manual release valve snap ring (5), then unscrew the manual release valve (6).
Remove the seal washer (7).

PUMP ASSY
Remove the drive joint (1) and filter (2).

Remove three bolts (3) and pump assy.

Remove the check valve (4), down-blow valve (5) and O-ring (6).

Remove the tilt rod joint.

Remove four bolts and cylinder housing.
When removing the cylinder housing, exercise care to avoid damaging the rip of oil seal.
CLEANING AND INSPECTING

Thoroughly wash all metal components with cleaning solvent and dry them with compressed air.
Arrange all components on a clean sheet of paper.
Do not lay PTT components out on a rag, as dirt or lint may be transferred to these items which may cause possible system operating problems.

Inspect manual release valve, down-blow valve, seal and O-ring.
Replace if cuts, nicks, excessive wear or other damages are found.
REASSEMBLY
Assembly is reverse of disassembly with special attention to following steps
• Do not reuse O-rings after removal, always use new O-rings.
• Lubricate all components and O-rings with PTT fluid before assembly.
• Do not reuse PTT fluid, always refill with new fluid.

CYLINDER HOUSING
Install the the cylinder housing .
Tighten four bolts.
When installing the the cylinder housing, exercise care to avoid damaging the rip of oil seal.

TILT ROD JOINT
Apply Thread Lock 1333B to the thread part of tilt rod joint

Tighten the tilt rod joint to specified torque.

MANUAL RELEASE VALVE
Oil and install the seal washer and manual release valve.
Tighten the valve to specified torque.
Install snap ring.


PUMP ASSY
Install the check valve and down-blow valve.

Install the pump assy.
Tighten three bolts to specified torque.

PTT MOTOR
AIR BLEEDING
PTT MOTOR

Removal
Remove the four screws securing the PTT motor to the pump & reservoir.

Detach the PTT motor from pump & reservoir.
Note the position of drive joint (1) and O-ring (2) and remove them.

Disassembly
For correct assembly, scribe an alignment mark on the field case and brush holder.
Remove the three screws securing the field case to the brush holder.
Using a soft face hammer, gently tap the field case from side to side to unseat it from the brush holder.
Slide the field case upward and away from the brush holder.
Note the position of the O-ring encircling the brush holder.
Slide the armature free of the brushes.

Inspection
- Armature and commutator
Check for continuity between the commutator and the armature core / shaft.
Replace armature if continuity is indicated.

Check continuity between the adjacent commutator segments.

Inspect the commutator surface.
If surface is gummy or dirty, clean with 400 grade emery paper.
Measure commutator outside diameter.

Commutator outside diameter :
Standard 22.0 mm (0.87 in)
Service limit 21.0 mm (0.83 in)
Replace armature if no continuity is indicated.
If measurement exceeds service limit, replace armature.

Ensure that the mica (insulator) between the segments is undercut to specified depth.
Commutator undercut :
Standard 0.5 – 0.8 mm (0.02 – 0.03 in)
Service limit 0.2 mm (0.01 in)
If undercut is less than service limit, cut to specified depth.
Remove all particles of mica and metal using compressed air
Wear safety grasses when using compressed air.

Brushes
Check the length of each brush.

Brush length :
Standard 9.8 mm (0.39 in)
Service limit 4.8 mm (0.19 in)
If brushes are worn down to the service limit, they must be replaced.

O-ring
Inspect the O-ring between the PTT motor and pump & reservoir.
Replace if cuts, nicks or tears are found.

Assembly
Assembly is reverse of disassembly with special attention to following steps.
When installing the armature, exercise care to avoid breaking brushes.

Installation
Installation is reverse of removal with special attention to following steps.
Ensure that the drive joint (1) is aligned and firmly inserted into the gear pump assembly.
Fit O-ring (2) to pump & reservoir.

- Check the level of PTT fluid contained in the pump & reservoir. If level is low, add recommended PTT fluid until level with mating surface of PTT motor.

- Ensure that the faces of the PTT motor and pump unit are free of dirt or debris.
When attaching the PTT motor to the pump & reservoir, ensure that the tip of armature shaft fits firmly into the drive joint.

- Tighten the four screws to specified torque.

INSTALLATION
Installation is reverse of removal with special attention to following step
- Apply grease to the cylinder lower shaft, cylinder upper shaft and bushes.


- Lower tilt rod full down position.
Place the PTT unit in position between the clamp brackets.
Tighten the clamp bracket shaft nut to specified torque.


- Tighten the lower shaft bolts, pre-coated with thread lock, to specified torque.


