PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Our warehouses are closed on Thursday and Friday, November 26th and 27th. Happy Thanksgiving!

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Service Manual DF40, DF50 Installation [121][Df40, Df50]

Related Products:
Service Manual DF40, DF50 Installation [121][Df40, Df50]
99500-87J08-01E
Suzuki Marine

Installation

  1. Remove two bolts and high pressure fuel filter (13).
  2. Disconnect lead wire connectors (14) from all fuel injectors.

  1. Remove four (4) bolts and Throttle body (15).

Remove IAC valve hose (16) from Throttle body.

  1. Remove bolts and nuts, and then remove intake manifold assembly (17).

INSTALLATION

Installation is reverse order of removal with special attention to the following steps.

Do not re-use gasket once removed. Always use a new gasket.

  • Apply the bond to both mating surfaces of the intake manifold gasket.

99000-31140 : Suzuki Bond 1207B

  • Tighten bolts and nuts securely.

Intake manifold bolt & nut :
  6 mm 11N•m (1.1 kg⋅m, 8.0 lb⋅ft.)
  8 mm 23N•m (2.3 kg⋅m, 16.5 lb⋅ft.)

  • Check to ensure that all removed parts are back in place.

Checking

  • Check fuel and water hose routing. (See page 10-7 to 10-9)
  • Check wire routing (See page 10-1 to 10-6)
  • Check for fuel leakage. (See page 5-3)
  • Check for water leakage.
Share on social:

Related Products