PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Service Manual 250-300 HP 3.4 L E-TEC Cooling System [Pressure Relief Valve Servicing]

Related Products:
Service Manual 250-300 HP 3.4 L E-TEC Cooling System [Pressure Relief Valve Servicing]
5007533
BRP Marine

PRESSURE RELIEF VALVE SERVICING

The pressure relief valve assembly should be ser viced at the same time as the thermostats.

Disassembly
Remove hose clamps and hoses from pressure valve.

  1. Hoses

Remove screws securing the bracket to power head. Remove the pressure valve housing.

PRESSURE RELIEF VALVE SERVICING Remove the bracket and the cap from the housing. Remove the pressure valve assembly.

  1. Bracket
  2. Cap

Inspection

Inspect all parts for cracks, heat damage, or signs of corrosion. Replace damaged parts. Clean debris from housing and parts.

Assembly
Assembly is the reverse of disassembly. Pay close attention when performing the following additional tasks.

Tighten bracket and cap screws to a torque of 60 to 84 in. lbs. (7 to 9.5 N·m).

Install valve on powerhead. Tighten nuts to a torque of 60 to 84 in. lbs. (7 to 9.5 N·m). Install hoses and secure with clamps.

Share on social:

Related Products