INSTALLATION

Install locating pins in position on the exhaust guide.
Align the locating-pin holes on the gasket with dowel pins and place the gasket on the bottom cowling.
Install the power head onto the bottom cowling, tighten the mounting-bolts to the specified torque.
Mounting bolts: 21 Nm (2.1 m⋅kg, 15 ft⋅lb)
Connect the hoses, cables and wires.
Install the apron.
Check the fittings installation, cable connections and functions before starting the engine to check operation and to check for leaks.
