EXPLODED DIAGRAM

REMOVAL AND INSTALLATION CHART
| Step | Procedure/Part name | Q'ty | Service points |
|---|---|---|---|
| CRANKSHAFT DISASSEMBLY | Follow the left "Step" for removal. | ||
| Piston | Refer to "PISTON" section | ||
| 1 | Circlip | ||
| 2 | Ball bearing | 1 | |
| 3 | Oil pump drive gear | 1 | Oil injection model |
| 4 | Crank disc seal ring | 9 | |
| 5 | Crankshaft | 1 | |
| Reverse the removal steps for installation. |
SERVICE POINTS
Bearing removal
1.Remove:
• Bearing
NOTE: Hold the bearing with the bearing separator, and force out the crankshaft with a press.

Bearing separator: YB-06219/90890-06534
Crank disc seal ring inspection
- Inspect:
- Crank disc seal ring (1)
Worn/Cracked/Damaged -> Replace.

- Measure:
- Ring dimension
Out of specification -» Replace.
Crank disc seal ring dimension:
L: 3.97 ~ 3.99 mm (0.156 ~ 0.157 in)
Limit 3.87 mm (0.152 in)
W: 3.48 ~ 3.72 mm (0.137 ~ 0.146 in)
Crankshaft inspection

- Measure:
• Runout
Use a V-blocks and dial gauge.
Out of specification -> Replace.
Runout limit: 0.05 mm (0.002 in)

- Measure:
• Axial play
Out of specification -> Replace.
Axial play limit: 2.0 mm (0.08 in)
Inspect:
• Crankshaft bearing
Pitting/Rumbling -> Replace.Inspect:
• Oil pump drive gear
Crack/Pitting/Wear -> Replace
