PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Our warehouses are closed on Thursday and Friday, November 26th and 27th. Happy Thanksgiving!

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Power Unit [Assembly And Adjustment] [1994]

Related Products:

Applicable Models

Model group Year Model Serial
Yamaha Outboard 1991 - 1995 55hp All

Power Unit [Assembly And Adjustment] [1994]
LIT-18616-00-43
Yamaha Marine

CRANKSHAFT MAIN BEARING

G71200 1

1) Press in the crank lower bearing to the crankshaft.

CAUTION:
When reassembling the lower crank bearing, the seal-cap side of the bearing should be in stalled toward the crank side, as show in the illustration.

2) Lubricate the bearing with 2-stroke outboard motor oil.

PISTON

G72000 0

1) Install the plain ring into the 2nd ring grooves with the markings facing upward.
2) Install the keystone ring into the top ring groove with the marking facing upward.
3) Align each ring end-gap with their locating pins.

SMALL END BEARINGS AND PISTON ASSEMBLY

G73000-0*

1) Count the small-end bearing needles.

Number of needles per smallend : 28-pcs.

CAUTION:
Do not use a mixture of new and used bearing needles in the same small end.

2) Using the special service tool. Install the bearings in the connecting-rod small end, and place washers on both sides.

CAUTION:
The washer should be placed with their convex sides facing the piston.

3) Insert the piston-pin into the piston.
4) Align the “UP” mark on the piston crown towards the crankshaft tapered end. Install the piston in the connecting-rod small end, insert the piston-pin, and then install new piston-pin clips.
5) Lubricate each bearing with 2-stroke outboard-motor oil.

CONNECTING ROD BIG END BEARING ASSEMBLY

G78001 0*

1) Install the piston.

Align the ring ends with locating pins in the grooves, and using the piston slider, push the piston into the cylinder.

NOTE:
The UP mark on the piston crown should be on the flywheel side. Be sure to apply oil to the piston and cylinder wall.

2) Place the crankshaft on the cylinder, and align the lower bearing locating pin with the locating pin hole on the cylinder, and fit the crankshaft correctly to the cylinder.

3) Install the bearing in the big end and install the cap.

The cap bolts should be tightened in the following manner.
a. Lightly screw in the bolts by hand while making sure the cap and rod ends are aligned completely. Then, tighten the bolts to half of the specified torque. Next, tighten to the specification. Check to see that the cap and rod ends are aligned. If not aligned, do the above procedure all over again.
b. Loosen the bolts 1/2 turn, and tighten them to half of the specified torque. Then, tighten to the specification.

NOTE:
Replace the cap bolts each time the connecting rod is disassembled.

Connecting rod big end :
  1st step : 17 Nm (1.7 m-kg. 12 ft-lb)
  2nd step: 35 Nm (3.5 m-kg. 25 ft-lb)

OIL SEAL HOUSING

G79001-1*

1) Press-fit the oil seals one by one.

CAUTION:
The direction of the oil seal must be as shown in the illustration, otherwise damage will be caused.

NOTE:
When press-fitting the oil seal, be sure that it faces in the correct direction.

2) Fit new O-ring in the grooves in the oil seal housing outer surfaces.

3) After installing the oil seal and O-ring, pack oil seal lip and outer surface of O-ring with Yamaha marine grease.

NOTE:
Avoid cutting or stretching the oil seal housing O-ring.

4) Install the oil seal housing onto the cylinder, and align the bolt holes.

Oil seal housing bolt : 8 Nm (0.8 m-kg, 5.8 ft-lb)

CRANK CYLINDER ASSEMBLY

G74002-0*

1) Align each locating-pin of the bearings and labyrinth-seals with each cut on the cylinder-block, then fit the crank assembly in place.
2) Film-coat the cylinder-block mating surface with Gasket Maker or equivalent.
3) Install the dowel-pins.
4) Match the cylinder-block and tighten the bolts in sequence and in two steps of torque.

Crankcase bolt :
  1st step:
    M6 : 6 Nm (0.6 m-kg, 4.3 ft-lb)
    M10: 20 Nm (2.0 m-kg, 14 ft-lb)
  2nd step:
    M6 : 12 Nm (1.2 m-kg, 9 ft-lb)
    M10: 40 Nm (4.0 m-kg, 29 ft-lb)

5) Check that the crankshaft turns smoothly.

CYLINDER HEAD AND EXHAUST COVER

G75000-0*

1) Install the gaskets, cylinder-head cover and exhaust cover.
2) Tighten the bolts in two sequences and in two steps of torque

[A] Tightening sequence

Cylinder head :
  1st step : 15 Nm (1.5 m-kg, 11 ft-lb)
  2nd step : 30 Nm (3.0 m-kg, 22 ft-lb)

[B] Tightening sequence

Cylinder head cover :
  Thermostat cover :
    8 Nm (0.8 m-kg, 5.8 ft-lb)

[C] Tightening sequence

Exhaust cover
  1st step : 4 Nm (0.4 m-kg, 2.9 ft-lb)
  2nd step : 8 Nm (0.8 m-kg, 5.8 ft-lb)

3) Install the thermostat, gasket and cover.

DRAINLESS HOSE

G75500-0

Fit two clips around the drainless hose.

Connect one end of the hose to the delivery side of the check valve and the other end to the joint on the intake side, and lock with the clips.

INTAKE MANIFOLD

G76000-0*

1) Install the reed-valve assembly, and the gasket reed-valve plate to the intake manifold.
2) Install the manifold assembly to the crank case, and tighten the bolts in sequence and in two steps of torque.

[A] Tightening sequence

Intake manifold : 8 Nm (0.8 m-kg, 5.8 ft-lb)

FUEL SYSTEM AND ELECTRICAL SYSTEM

G77000-0*

1) Install the fuel system referring to page 4-1.
2) Install the electrical system referring to page 8-1.

Share on social:

Related Products