PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Our warehouses are closed on Thursday and Friday, November 26th and 27th. Happy Thanksgiving!

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Maintenance, Lubrication, And Storage [Linkage Adjustment] [2007]

Related Products:

Applicable Models

Model group Year Model Serial
Yamaha International 2004 30hp All
Yamaha Outboard 2004 - 2005 40hp All
Yamaha International 2004 40hp All

Maintenance, Lubrication, And Storage [Linkage Adjustment] [2007]
LIT-18616-JD-40
Yamaha Marine

GENERAL

Occasionally, check all mounting bolts, intake screws, linkage connections, etc., to be sure they are tight.

BEARING LUBRICATION

The need for frequent lubrication of your Yamaha Jet Drive Outboard cannot be overemphasized. We recommend lubrication after each day’s use and every 10 hours of operation. Make greasing a regular part of your cleanup. Use only Yamalube Marine Grease, or NLG1 No. 1-rated greases with a suitable grease gun.

The bearing lubrication fitting is located at the top-left-front of the jet drive casing. It is capped with a fitting on the end of the excess-grease exit hose. Pump in enough grease to just fill the hose. To remove the hose from the fitting, press the end cap upward and toward the casing; to refit it, press the hose end cap over the fitting.

Every 30-40 hours, pump in enough extra grease to purge any moisture. The texture of the old grease coming out of the hose will provide you with an indication of conditions inside the bearing housing. A gradual increase in moisture content indicates seal wear. If the grease begins to turn a dark, dirty gray, the bearing(s) and seals should be inspected and replaced as necessary. Some discoloration of the grease is normal during the break-in period on a new set of seals.

IMPELLER CLEARANCE SETTING

If the impeller clearance between the impeller edge and the water intake casing wall exceeds about 1/32" (usually due to wear from operation in water with a sand or gravel bottom), the clearance can be adjusted. There are shim washers underneath the impeller. Move one or more shims from underneath to on top of the impeller. This locates the impeller further into the tapered casing to reduce the clearance. Be sure to grease the shaft hole in the impeller, the key, sleeve, and shaft threads any time it becomes necessary to remove the impeller.

See the Assembly Instructions for your model later in this manual for more detailed instructions.

Your jet drive is equipped with a shear key to protect it in the event of a rock jam. This key can be located by removing the water intake housing and the drive shaft nut. The key holds the jet drive impeller on the drive shaft. This is similar to that on a propeller drive. After replacing the key, draw the shaft nut up tight (17 ft-lb) to remove any play between the impeller and shaft. Note the position of the impeller shim washers, and replace them in the same order as removed.

LINKAGE ADJUSTMENT

Occasionally, check the adjustment of the shift linkage. In “Forward,” the reverse gate should be firmly locked. This will eliminate rattle and prevent wave action from accidentally shifting the gate into reverse. (See “ADJUSTMENTS” for the proper procedures.)

SALT WATER OPERATION

Both aluminum and stainless steel have been extensively used in the construction of your jet drive. These and other materials have been either treated or are inherently resistant to corrosion. In addition, the intake grille, special key, and exhaust tube are galvanized to further minimize corrosion. It is still recommended, when not in use, the motor be tipped up so the jet drive casing is out of the water.

If your jet drive is used in salt water more than fresh water, remove all mounting hard ware, and grease it at least once every six months. Failure to do this may result in the hardware being difficult, if not impossible, to remove at a later date.

To facilitate removal of an impeller that has frozen to the drive shaft, use a hammer and a block of wood, and tap the impeller blades in the direction of engine rotation. This will release the shear key.

ADDED NOTE: A slightly distorted shear key may be reused.

Share on social:

Related Products