PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Our warehouses are closed on Thursday and Friday, November 26th and 27th. Happy Thanksgiving!

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Electrical System [Ignition System] [2005]

Related Products:

Applicable Models

Model group Year Model Serial
Yamaha Outboard 1988 - 1989 115hp All
Yamaha Outboard 1988 - 1989 130hp All

Electrical System [Ignition System] [2005]
LIT-18616-00-41
Yamaha Marine

EXPLODED DIAGRAM

(1) Needle valve
(2) Main jet
(3) Slow air jet
(4) Main nozzle
(5) Pilot screw
(6) Float

REMOVAL AND DISASSEMBLY

WARNING:
At this step, ensure there is no spillage of gasoline on removing the connections.

1) Remove the silencer cover, disconnect the fuel hose, then remove the carburetor.

2) Referring to the exploded diagram, use a screwdriver to disassemble the carburetor.

CLEANING

1) Using solvent, clean the components thoroughly, and blow-dry them with compressed air.

WARNING:
Protect your eyes with suitable safety spectacles or safety goggles when using compressed air.Protect your eyes and the eyes of other persons by directing the flow of compressed-air downward, noting that solvent and small parts may be blown off.

CAUTION:
Do not use steel wire for cleaning the jets as this may enlarge the jet diameters and seriously affect performance.

INSPECTION

Carburetor body

1) Inspect the carburetor body for cracks or clogging of the passages.

Needle valve
1) Inspect the needle valve for free movement and wear, and replace it required.

Main jet
1) Inspect the main jet for wear and stuffing, and replace it required.

Slow air jet
1) Inspect the slow air jet for wear and stuffing, and replace it required.

Main nozzle
1) Inspect the main nozzle for wear and stuffing, and replace it required.

Pilot screw
1) Inspect the needle of pilot screw for wear, and replace it required.

Float

1) Visually inspect the float for damage or cracks, and replace if required.

2) Measure the float height. If it is higher or lower than the specified float height, recheck the valve seat and needle-valve.
Specified float height: 16.0 mm (0.63 in)

ASSEMBLY AND INSTALLATION

1) Screw in the main nozzle until tight.

2) Install the needle-valve on the float, attach the float to the carburetor body with the float-pin.

3) Referring to the exploded diagram, assemble the carburetor.

4) Referring to the exploded diagram, install the carburetor assembly and the silencer to the intake manifold.

Share on social:

Related Products