CHARGING SYSTEM

(1) Lighting coil
(2)Rectifier/regulator
(3) Fuse holder
(4) Fuses (80A)
(5) Battery
B : Black
G : Green
R : Red
CHECKING THE BATTERY
Refer to "CHECKING THE BATTERY" on page 3-19.
CHECKING THE FUSES
Refer to "CHECKING THE FUSES" on page 8-13.
CHECKING THE FUSE HOLDER
Refer to "CHECKING THE FUSE HOLDER" on page 8-13.
MEASURING THE RECTIFIER/REGULATOR OUTPUT PEAK VOLTAGE

Measure:
- Rectifier/regulator output peak voltage
Below specification -> Replace the rectifier/regulator.

Before measuring the rectifier/regulator output peak voltage;
• Measure the lighting coil output peak volt age.
• Disconnect the rectifier/regulator coupler (blue) (1).
MEASURING THE LIGHTING COIL OUTPUT PEAK VOLTAGE

Measure:
- Lighting coil output peak voltage
Below specification -» Replace the lighting coil.

Before measuring the lighting coil output peak voltage, disconnect the rectifier/regu lator coupler (blue) ©. 8-43