PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Our warehouses are closed on Thursday and Friday, November 26th and 27th. Happy Thanksgiving!

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Bracket Unit [Steering Handle Disassembly] [2000]

Related Products:

Applicable Models

Model group Year Model Serial
Yamaha Outboard 1995 - 2000 60hp All

Bracket Unit [Steering Handle Disassembly] [2000]
LIT-18616-01-29
Yamaha Marine

EXPLODED DIAGRAM

REMOVAL AND INSTALLATION CHART

Step Procedure/Part name Q'ty Service points
STEERING BRACKET REMOVAL Follow the left "Step" for removal
1 Wire harness coupler 1 EM model
2 Clip 1
3 Throttle cable 1
4 Clip 1
5 Shift cable 1
6 Bolt (with washer) 2
7 Fitting plate 1 NOTE: When installing the fitting plate, lift the tiller handle straight up.
8 Cable clamp 1
9 Grommet 1
10 Nut 2 Steering friction model
11 Plate washer 2
12 Steering rod 1
13 Nut 2
14 Steering bracket assembly 1
15 Friction shaft 1 Steering friction model
16 Wing nut 1
17 Bolt 1
18 Friction body 1
Reverse the removal steps for installation.

SERVICE POINTS

Control cable inspection

  1. Inspect:
    • Throttle cable
    • Shift cable
    Kink/Fray/Stick -> Replace.

Shift lever inspection

  1. Inspect:
    • Shift lever
    Wear/Crack/Damage Replace.

Friction body inspection

  1. Inspect:
    • Friction body
    Wear/Crack/Damage —> Replace.

EXPLODED DIAGRAM

REMOVAL AND INSTALLATION CHART

Step Procedure/Part name Q'ty Service points
STEERING BRACKET DISASSEMBLY Follow the left "Step" for removal.
Steering bracket assembly Refer to "STEERING BRACKET REMOVAL" section.
1 Nut 1
2 Bolt 1
3 Steering handle assembly 1
4 Washer (nylon) 2
5 Washer (steel) 2
6 Wave washer 1
7 Plate washer 1
8 Bushing 1
9 Cotter pin 1
10 Plate washer 1
11 Shift rod 1 1
12 Cotter pin 1
13 Plate washer 1
14 Shift rod 2 1
15 Nut 1
16 Plate washer 1 10.5 x 16.5 mm
17 Bushing 1
18 Plate washer 1 12.3 x 17.5 mm
19 Gear shift handle 1
20 Bushing 1
21 Collar 1
22 Ball 1
23 Spring 1
24 Grip 1
25 Engine stop switch lead 2
26 Nut 1
27 Engine stop switch 1
28 Bolt (with washer) 1 EM model
29 Clamp 1
30 Bolt (with washer) 1 6 x 20 mm
31 Bolt (with washer) 1 6 x 30 mm
32 Screw 1 6 x 25 mm
33 Main switch assembly 1
34 Bolt (with washer) 2 6x16 mm
35 Plate 1
36 Steering bracket 1
Reverse the removal steps for installation.

SERVICE POINTS

Bushing inspection

  1. Inspect:
    • Bushing
    Wear/Crack/Damage -» Replace.

Shift rod inspection

  1. Inspect:
    • Shift rod
    Wear/Crack/Damage ->Replace.

EXPLODED DIAGRAM

REMOVAL AND INSTALLATION CHART Step

Step Procedure/Part name Q'ty Service points
STEERING HANDLE DISASSEMBLY Follow the left "Step" for removal.
1 Screw 4
2 Wire holder 1
3 Gasket 1
4 Screw 1
5 Steering grip 1
6 Plate washer 1
7 Spring 1
8 Bushing 1
9 Throttle coble 1
10 Spring pin 1
11 Throttle shaft 1
12 Throttle lever housing 1
13 Throttle lever 1
14 Bolt (with washer) 1
15 Friction piece 1
16 Wing nut 1
17 Bolt 1
18 Steering handle 1
Reverse the removal steps for installation.

SERVICE POINTS

Throttle lever inspection

  1. Inspect:
    • Throttle lever
    Wear/Crack/Damage-> Replace.

Throttle shaft inspection

  1. Inspect:
    • Throttle shaft
    Wear/Crack/Damage —> Replace.

Friction piece inspection

  1. Inspect:
    • Friction piece
    Wear/Crack/Damage -> Replace.
Share on social:

Related Products