PREPARE FOR WINTER: 10-50% discount on all OEM parts!

Unless prohibited by manufacturer. Does not include aftermarket or Crowley Marine branded products. Priced as marked.

Our warehouses are closed on Thursday and Friday, November 26th and 27th. Happy Thanksgiving!

Search Over 1 Million OEM Parts
Easy-to-use  parts diagrams Best price  guarantee Expert  live support 50+ years  of serving boaters Huge selection of OEM parts  -  from 1950 to 2026 Most parts in stock  -  Same day fulfillment
Most parts in stock- Same day fulfillment

Bracket Unit [Ptt Unit] [2017]

Related Products:
Bracket Unit [Ptt Unit] [2017]
LIT-18616-03-36
Yamaha Marine

PTT unit

No. Part name Q’ty Remarks
1 Shaft 1
2 Circlip 2
3 Plastic tie 4
4 Bushing 2
5 Bushing 2
6 PTT unit 1
7 Ground lead 1
8 Bolt 1 M6 x 10 mm
9 Bolt 8 M10 x 45 mm

Removing the PTT unit

When removing the PTT unit with the power unit installed, make sure to suspend the outboard motor.

  1. Fully tilt the swivel bracket up, and then support it using the tilt stop lever (1).

If the PTT unit does not operate, open the manual valve (2) by turning it counterclockwise, and then tilt the swivel bracket up manually.

  1. Remove the plastic ties (3), and then pull out the PTT motor lead (a) from the clamp bracket (STBD).

  1. Disconnect the groud lead (4).

  2. Remove the circlips (5). and shaft (6).

  1. Connect the PTT motor leads (a) to the battery terminals to fully retract the PTT rams.

Ram PTT motor lead Battery terminal
Down Light green (Lg) (+)
Down Sky blue (Sb) (-)
  1. Remove the PTT unit (7).

Checking the hydraulic pressure

Check the hydraulic pressure. Check the internal parts if out of specification.

Before removing the reservoir cap, make sure that the PTT rams are fully extended. Otherwise, fluid could be expelled forcefully from the PTT unit due to internal pressure.

  1. Fully extend the PTT rams.

  2. Place the PTT unit in an upright position.

  3. Remove the reservoir cap (1), and then check the fluid level in the reservoir.

If the fluid is at the proper level, a small amount of fluid should flow out of the filler hole.

  1. If the fluid is below the proper level, add the recommended fluid.

Recommended PTT fluid : Yamalube Marine Power Trim and Tilt Fluid or ATF Dexron II

  1. Install the reservoir cap (1), and then tighten it to the specified torque.

Reservoir cap (1) : 7 N•m (0.7 kgf•m, 5.2 ft•lb)

  1. Loosen the pipe joints (2), and then remove the pipe joint at end (a).

  2. Install the special service tool (3).

PTT pressure gauge (3) : YB-06580

Place the PTT unit in the drain pan.

  1. Connect the PTT motor leads to the battery terminals to fully retract the trim rams, and then measure the hydraulic pressure when the reading on the pressure gauge stabilizes.

Ram PTT motor lead Battery terminal
Down Light green (Lg) (+)
Down Sky blue (Sb) (-)

Hydraulic pressure (down) (reference data) : 6.7-8.7 MPa (67.0-87.0 kgf/cm2, 971.5-1261.5 psi)

  1. Reverse the PTT motor leads between the battery terminals to fully extend the trim rams.

Ram PTT motor lead Battery terminal
Up Sky blue (Sb) (+)
Up Light green (Lg) (-)
  1. Remove the special service tool (3).

  2. Install the pipe joints (2), and then tighten them to the specified torque.

Pipe joint (2) : 15 N•m (1.5 kgf•m, 11.1 ft•lb)

  1. Connect the PTT motor leads to the battery terminals to fully retract the PTT rams.

  2. Loosen the pipe joints (4) and then remove the pipe joint at end (b).

  3. Install the special service tool (3).

PTT pressure gauge (3) : YB-06580

  1. Connect the PTT motor leads to the battery terminals to fully extend the trim rams, and then measure the hydraulic pressure when the reading on the pressure gauge stabilizes.

Ram PTT motor lead Battery terminal
Up Sky blue (Sb) (+)
Up Light green (-)

Hydraulic pressure (up) (reference data) : 13.0-15.0 MPa (130.0-150.0 kgf/cm2, 1885.0-2175.0 psi)

  1. Reverse the PTT motor leads between the battery terminals to fully retract the trim rams.

Ram PTT motor lead Battery terminal
Down Light green (Lg) (+)
Down Sky blue (Sb) (-)
  1. Remove the special service tool (3).

  2. Install the pipe joints (4), and then tighten them to the specified torque.

Pipe joint (4) : 15 N•m (1.5 kgf•m, 11.1 ft•lb)

  1. After measuring the hydraulic pressure, connect the PTT motor leads to the bat tery terminals to fully extend the PTT rams.

  1. Place the PTT unit in an upright position.

  2. Repeat steps 3-5 to check the fluid level.

Bleeding the PTT unit

  1. Place the PTT unit in an upright position.

  2. Close the manual valve (1) by turning it clockwise.

Manual valve (1) : 2 N•m (0.2 kgf•m, 1.5 ft•lb)

  1. Check the fluid level. See steps 3-5 in “Checking the hydraulic pressure” (9-38).

  2. Connect the PTT motor leads to the battery terminals to fully retract the PTT rams.

  3. Reverse the PTT motor leads between the battery terminals to fully extend the PTT rams.

Ram PTT motor lead Battery terminal
Down Light green (Lg) (+)
Down Sky blue (Sb) (-)
Up Sky blue (Sb) (+)
Up Light green (Lg) (-)

If the PTT rams do not move up and down easily, push and pull on the PTT rams to assist operation.

  1. Check the fluid level when the PTT rams are fully extended. If the fluid level is low, add sufficient fluid, and then repeat steps 4 and 5.

Installing the PTT unit

• After tilting the swivel bracket up, make sure to support it using the tilt stop lever.
• When installing the PTT unit with the power unit installed, make sure to suspend the outboard motor.

  1. Connect the PTT motor leads (a) to the battery terminals to retract the PTT rams.

Ram PTT motor lead Battery terminal
Down Light green (Lg) (+)
Down Sky blue (Sb) (-)
  1. Fully tilt the swivel bracket up, and then support it using the tilt stop lever (1).

  1. Install the bushings (2) and (3) to the tilt ram end and swivel bracket.

  2. Install the PTT unit (4), and then tighten the PTT unit bolts (5) to the specified torque.

PTT unit bolt (5) : 42 N•m (4.2 kgf•m, 31.0 ft•lb)

  1. Pass the PTT motor lead (a) through the hole (b) in the clamp bracket (STBD).

  2. Connect the PTT motor leads (a) to the battery terminals to extend the PTT rams.

Ram PTT motor lead Battery terminal
Up Sky blue (Sb) (+)
Up Light green (Lg) (-)
  1. Insert the shaft (6), and then install the circlips (7).

  2. Connect the ground lead (8).

  1. Fasten the PTT motor lead (a) and trim sensor lead using the plastic ties (9).

Share on social:

Related Products