EXPLODED DIAGRAM

| Step | Procedure/Part name | Q'ty | Service points |
|---|---|---|---|
| BOTTOM COWLING REMOVAL | Follow the left "Step" for removal. | ||
| Power unit | Refer to "POWER UNIT REMOVAL" section. | ||
| 1 | Shift actuator | 1 | |
| 2 | Plate | 1 | |
| 3 | Fitting plate | 1 | |
| 4 | Grommet | 1 | |
| 5 | PTT motor lead | 1 | |
| 6 | Trim sensor cable | 6 | |
| 7 | Bolt (with washer) | 4 | |
| 8 | Speedometer hose | 1 | |
| 9 | Flushing hose | 1 | S(L)150, S175, S(L)200 model |
| 10 | Bottom cowling assembly | 10 |
Reverse the removal steps for installation.
