Engine Assembly of Johnson/Evinrude Powerheads
• Install .0002" larger jets in carburetors. • Max timing MUST be retarded 2 degrees. • Max timing MUST be set with engine running over 4500 RPM & under load. DO NOT STATIC SET MAX TIMING. • Re-torque cylinder heads to specs. • After 1 hour of break-in, allow engine to cool and retorque heads. • On 3 Cylinder engines, replace water pump with new high pressure water pump. • On 3 Cylinder engines, drill and relocate overboard sensors. • On 3 Cylinder engines, check latest OMC service bulletins and jet carburetors accordingly. THIS IS VERY IMPORTANT. • Use 92-94 octane premium fuel. • Clean and refill oil tank with TCW-3 oil. • Mark oil tank to verify oil comsumption during double oil usage of break-in period. • Run double oil during the first 30 gallons of fuel. • If running oil injection use 1 pint oil per 6 gallons gas. • If no oil injection, use 1 quart oil per 6 gallons gas. • Crowley Marine recommends installing water pressure gauge to monitor water flow. • Crowley Marine suggests removal of oil injection system or updating to latest VRO pump. • Crowley Marine recommends you replace water pump and gasket at time of powerhead replacement and every 2 years afterwards.
Carefully following these instructions will aid in the proper assembly & break-in of your OMC engine
|